Operator workspace
DEMO · seeded data
V11 REQUIREMENT-BACKED MODULE

Irrigation accounting

Actual-use measurement, farmer allocations, allowances and collection reconciliation.

Seeded demonstration only. Production state transitions require workspace-scoped permissions, source lineage, explicit evidence status and audit events.

Active service points

1,284

Measured coverage

91.3%

Allowance used

68%

Unmatched collection

KSh 42k

Trend / evidence window

Illustrative operational view with explicit source quality.

Seeded

Priority queue

Farmer F-102Within allowance
Ready
Block 7Meter silence
Review
Canal C-04Bulk-to-farm variance
Critical

Canonical accountability trace

01source/inflow
02zone/site
03service point
04meter/read
05consumption
06tariff/bill
07payment/allocation
08variance/case
09work order
10verification

Control rules

  • Evidence and confidence stay visible.
  • History is not overwritten.
  • High-risk actions are approval-gated.
  • Vendor adapters never become the domain model.