Operator workspace
DEMO · seeded data
V11 REQUIREMENT-BACKED MODULE

Hardware certification

Run protocol, metrology, lifecycle and field conformance evidence before production.

Seeded demonstration only. Production state transitions require workspace-scoped permissions, source lineage, explicit evidence status and audit events.

Required tests

42

Passed

35

Blocked

5

Failed

2

Trend / evidence window

Illustrative operational view with explicit source quality.

Seeded

Priority queue

Duplicate packetPass
Ready
Valve ack timeoutReview
Review
Model-specific STS certificateMissing
Critical

Canonical accountability trace

01source/inflow
02zone/site
03service point
04meter/read
05consumption
06tariff/bill
07payment/allocation
08variance/case
09work order
10verification

Control rules

  • Evidence and confidence stay visible.
  • History is not overwritten.
  • High-risk actions are approval-gated.
  • Vendor adapters never become the domain model.